Previous | Calendar |
January |
2022 |
Next | ||
---|---|---|---|---|---|---|
Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday |
26JD360 |
27JD361 |
28JD362 |
29JD363SpB Returns |
30JD364at 13:30 MST, lost contact with the tower (power outage) at 11:30 AM, the "Marshall" Fire burns in Marshall/Superior/Louisville strong winds |
31JD365at 12:10 MST, power/network restored and able to reconnect to isffa FAST CR23X did not come back up (restored program on 1/7) in PM, heavy snow |
1JD1 |
2JD2 |
3JD3 |
4JD4at 23:00 MST, auto-reboot of urquell |
5JD5 |
6JD6at around 18:35 MST, 21.5m LI-7500A (op2) and LI-7200 rebooted (likely a short power outage) |
7JD7Site Visit (SpB): Details , Photos (22) Span cylinder at 1100 psi, N2 at 1000 psi reloaded program and OS to FAST CR23x (now working again!) at 15:10 MST, cleared snow off the subcanopy rad sensors and 2.5m CSAT3/IRGAs (see photos) at around 15:20 MST, tried to reboot FLIR computer Enterprise compact quite windy |
8JD8 |
9JD9 |
10JD10at 1:00 MST, lost contact with isffa at 9:00 MST, rebooted the radio modem at the site; contact re-established calm winds |
11JD11 |
12JD12 |
13JD13 |
14JD14at 21:15 MST (1/15, 4:15 UTC), Tonga underground volcano erupts USGS |
15JD15at around 06:30 MST, NWS reports that the Tonga pressure wave passed through Boulder NWS Tweet |
16JD16 |
17JD17 |
18JD18GTP Meeting (NCAR) |
19JD19 |
20JD20 |
21JD21 |
22JD22 |
23JD23 |
24JD24 |
25JD25 |
26JD26 |
27JD27 |
28JD28 |
29JD29 |
30JD30Site Visit (SpB): Details , Photos (22) Span cylinder at 1000 psi, N2 at 500 psi moved N2 cylinder cc702638 (or cc702636?) from C-1 to the shed at base of tower the 16m prop-vane is completely GONE! (see photo) downloaded data from bowling CR1000 FLIR computer could not find boot disk; likely hard drive failure; removed from tower SpB Pruis sunny, slight wind, warm |
31JD31 |
1JD32SpB Off |
2JD33very cold; snow |
3JD34very cold |
4JD35 |
5JD36 |