Previous | Calendar |
February |
2021 |
Next | ||
---|---|---|---|---|---|---|
Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday |
31JD31 |
1JD32SpB Off |
2JD33SpB Off |
3JD34 |
4JD35 |
5JD36 |
6JD37 |
7JD38 |
8JD39 |
9JD40 |
10JD41 |
11JD42 |
12JD43 |
13JD44Very cold (especially on plains) |
14JD45Very cold |
15JD46Presidents Day (NCAR holiday, no CU holiday) SpB Off |
16JD47 |
17JD48 |
18JD49 |
19JD50 |
20JD51Site Visit (SpB): Details , Photos (36) Span cylinder at 1100 psi, N2 at 410 psi Moved span cylinder cc239886 from tower to trailer at C-1 Put n2 cylinder cc113101 into the TGA shed (it was in front of it) At around 12 MST, started collecting MRS snowprobe data (plugged in MRS logger) Checked DB's cr1000 logger (it was fine, the network cable in the shed was disconnected) thumb drive of the LI-7200 filled up (missed 7 hours of data!) SpB Prius C Light flurries at times; partly cloudy |
21JD52Windy |
22JD53 |
23JD54 |
24JD55In PM: snow (4-8 inches) |
25JD56at around 2:30 MST, 21.5m LI-7500A (op2) rebooted (power outage) |
26JD57 |
27JD58 |
28JD59 |
1JD60 |
2JD61 |
3JD62 |
4JD63 |
5JD64 |
6JD65 |