Previous

Calendar

September

2020

Next
Sunday Monday Tuesday Wednesday Thursday Friday Saturday

30

JD243
Site Visit (PB): Details , Photos (46)

Span cylinder at 100 --> 1900 psi, N2 at 300 --> 1650 psi

at approx midday, removed cc234071 (n2) and started cc442238 (N2) at 1650 psi

at approx midday, removed cc239886 (span) and started cc325800 (span) at 1900 psi

Downloaded data from the remote EOS FD sensors #3 and #4

Downloaded data from the SOIL and TC loggers

Turned off the fan in the LI-6262 box

Clear in AM, wind and clouds in PM

31

JD244

1

JD245

2

JD246

3

JD247

4

JD248

5

JD249

6

JD250

7

JD251

8

JD252
at 9:04 MST, isffa rebooted (unclear why it rebooted?)

Power outage from 16:30 to around 19:00 MST

Above-canopy CSAT3s are iced-up; subcanopy CSAT3s not working very well

Big drop in temperature; first signifcant snow of the season!

9

JD253
Above-canopy CSAT3s remain iced-up; subcanopy CSAT3s not working very well

10

JD254
Above-canopy CSAT3s iced-up till around 12 MST, then ok

11

JD255

12

JD256

13

JD257

14

JD258

15

JD259
SpB Off

16

JD260
In an attempt to control COVID-19, CU asks all students to do a 2-week quarantine

17

JD261

18

JD262

19

JD263

20

JD264

21

JD265

22

JD266
Fall Equinox

23

JD267
In an attempt to control COVID-19, all classes at CU are done remotely

SpB Off

24

JD268

25

JD269

26

JD270
Site Visit (RA, RC): Details

Rachel and Tom checked on dendrobands.

27

JD271

28

JD272

29

JD273

30

JD274

1

JD275
SpB Off

2

JD276
SpB Off

3

JD277
Site Visit (PB): Details , Photos (57)

Span cylinder at 1600 psi, N2 at 1250 psi

Downloaded data from the remote EOS FD sensors #3 and #4 (positive power wire became disconnected)

Downloaded data from the SOIL and TC loggers

powered up the NOAH logger

Cool, calm, and clear (smoke is noticeable)