Previous | Calendar |
November |
2020 |
Next | ||
---|---|---|---|---|---|---|
Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday |
1JD306Site Visit (PB): Details , Photos (52) Span cylinder at 1400 psi, N2 at 900 psi (valves closed on both) from 10:00-10:30 MST, swapped inlet assembly for LI-7200 Downloaded data from the remote EOS FD sensors #3 and #4 Downloaded data from the MET, UCB, NOAH, SOIL and TC loggers Gusty with blue skies |
2JD307SpB Off |
3JD308Six cylinders (2 LBL, 4 Airgas) were delivered to the MRS snowshed by CU distribution services |
4JD309SpB Off |
5JD310 |
6JD311 |
7JD312 |
8JD313 |
9JD314In PM: snow |
10JD315In AM, the USFS Stage 3 closure of the National Forest is rescinded |
11JD316SpB Off (sick day) |
12JD317 |
13JD318 |
14JD319 |
15JD320Windy |
16JD321at around 1:00 MST, lost contact with the tower (this was a radio modem issue) at around 7:10 MST, remotely rebooted the radio modem at the tower SpB Off Windy |
17JD322SpB Off |
18JD323 |
19JD324SpB Off |
20JD325at 17:00 MDT: Boulder County changes COVID-19 Status from "Orange: High Risk" to "Red: Severe Risk" |
21JD326 |
22JD327 |
23JD328 |
24JD329In AM: snow |
25JD330SpB Off |
26JD331CU Holiday (Turkey Day) |
27JD332CU Holiday (Day after Turkey Day) |
28JD333 |
29JD334 |
30JD335 |
1JD336 |
2JD337 |
3JD338 |
4JD339 |
5JD340Site Visit (PB): Details , Photos (37) Span cylinder at 1400 psi, N2 at 900 psi (valves closed on both) Downloaded data from the remote EOS FD sensors #3 and #4 Downloaded data from the CNR/RAD, NOAH, SOIL and TC loggers Calm with blue skies (some snow on ground) |