Previous

Calendar

December

2019

Next
Sunday Monday Tuesday Wednesday Thursday Friday Saturday

1

JD335
at around 18:00 MST, power is restored to the tower (still no network connection)

2

JD336
no network connection (but power is back on)

3

JD337
at around 11 MST, network connection is restored (most data seem ok)

after the power outage, the 2.5m CSAT3 did not come back up cleanly

after the power outage, the 2.5m LI-7500A (OP1) did not come back up cleanly

high winds

4

JD338

5

JD339

6

JD340

7

JD341

8

JD342

9

JD343

10

JD344

11

JD345

12

JD346

13

JD347

14

JD348

15

JD349

16

JD350

17

JD351

18

JD352
Site Visit (SpB, MR): Details , Photos (22)

Span cylinder at 500 psi, N2 at 700 psi

moved span cylinder cc325800 from the trailer to the tower

at 13:15 MST, power-cycled the 2.5 CSAT3 (now working again)

2.5m LI-7500A was not working, pulled usb drive and left it unplugged

at around 14:00 MST, cleared snow from the subcanopy rad sensors (see photos)

Enterprise rental

Clear skies and calm

19

JD353

20

JD354

21

JD355
Winter Solstice

22

JD356

23

JD357
SpB Off

24

JD358

25

JD359

26

JD360

27

JD361

28

JD362

29

JD363

30

JD364
SpB Returns

31

JD365

1

JD1

2

JD2

3

JD3

4

JD4