1JD335at around 18:00 MST, power is restored to the tower (still no network connection) |
2JD336no network connection (but power is back on) |
3JD337at around 11 MST, network connection is restored (most data seem ok) after the power outage, the 2.5m CSAT3 did not come back up cleanly after the power outage, the 2.5m LI-7500A (OP1) did not come back up cleanly high winds |
4JD338 |
5JD339 |
6JD340 |
7JD341 |
8JD342 |
9JD343 |
10JD344 |
11JD345 |
12JD346 |
13JD347 |
14JD348 |
15JD349 |
16JD350 |
17JD351 |
18JD352Site Visit (SpB, MR): Details , Photos (22) Span cylinder at 500 psi, N2 at 700 psi moved span cylinder cc325800 from the trailer to the tower at 13:15 MST, power-cycled the 2.5 CSAT3 (now working again) 2.5m LI-7500A was not working, pulled usb drive and left it unplugged at around 14:00 MST, cleared snow from the subcanopy rad sensors (see photos) Enterprise rental Clear skies and calm |
19JD353 |
20JD354 |
21JD355Winter Solstice |
22JD356 |
23JD357SpB Off |
24JD358 |
25JD359 |
26JD360 |
27JD361 |
28JD362 |
29JD363 |
30JD364SpB Returns |