Previous

Calendar

April

2015

Next
Sunday Monday Tuesday Wednesday Thursday Friday Saturday

29

JD88

30

JD89
at 7:00 MST, LI-7200 *ghg files stop being archived

31

JD90

1

JD91

2

JD92

3

JD93

4

JD94
Gap1 in MRS data file (starts)

5

JD95

6

JD96

7

JD97
Site Visit (ES, JK, NM, +): Details

ES added a CO2 span cylinder to the CPEC200 (as a check of instrument span)

Site visit by snow hydrology class (NM)

Gap1 in MRS data file (ends)

SpB COMP1

8

JD98
SpB COMP2

9

JD99
Gap2 in MRS data file (starts)

10

JD100
SpB COMP3

11

JD101

12

JD102

13

JD103

14

JD104
Site Visit (JK): Details

15

JD105
Site Visit (SpB): Details , Photos (29)

Span cylinder at 1400 psi. N2 at 800 psi

at approx 10 MST, reset/rebooted LI-7200

from 10:28-10:30 MST, adjusted span/zero flow in LI-6262

swapped SD card from cloudCAM /

SpB Jeep

Overcast w/ some sun breaks (plus light snow)

16

JD106
some snow

17

JD107
MORE snow

18

JD108

19

JD109

20

JD110

21

JD111

22

JD112
Site Visit (JK): Details

23

JD113

24

JD114

25

JD115
NCTC logger (/dev/ttyS10) drops off data system? tried ddn/dup, but didn't fix it.

26

JD116

27

JD117
Snow (CSATs not working)

28

JD118
at approx 11 MST, the flow rate in 6262 drops; something constricting flow? (it seems to recover)

Still snowy (CSATs still struggling)

29

JD119
Site Visit (JK): Details

SpB COMPS Exam

at approx 12:00 MST, LI-7200 *ghg files stop being archived

30

JD120

1

JD121
Site Visit (SpB): Details , Photos (33)

Span cylinder at 1310 psi. N2 at 500 psi

at approx 11:20 MST, connected aspiration/fan to the two REBS T/RH sensors

at approx 12 MST, disconnected power from LI-7500A at 2.5m

at approx 17 MST, reset/rebooted LI-7200

at 15:30 MST, started ops76: removed Tir variables from NCTC logger (started nctc_05.csi)

swapped SD card from towerCAM

SpB Jeep

Sunny in morning, then thunder/lightning/snow/rain

2

JD122