Previous | Calendar |
February |
2015 |
Next | ||
---|---|---|---|---|---|---|
Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday |
1JD32 |
2JD33 |
3JD34Site Visit (JK): Details JK added new extention cord from tower to the picarro shed |
4JD35 |
5JD36Site Visit (ES): Details ES updated EC155 firmware and for 27m-level CSATs: switched CSAT3B embedded code from v5.0 to v4.0 and CSAT3 #3 from v4.0 to v5.0 |
6JD37 |
7JD38Site Visit (SpB): Details , Photos (32) Span cylinder at 250 psi. N2 at 600 psi moved cc319297 (n2) to tower (along fence) re-started the picarro system (moved from DB shed) at around 14:00 MST, re-started LI-7500A OP1 from approx 15:01-15:15 MST, Changed 2-micron Nupro filter in profile (li-6251) box from 15:30-15:40 MST, swiped krypton hygrometer CU Prius very windy, very warm (clear skies) |
8JD39very windy |
9JD40 |
10JD41 |
11JD42 |
12JD43Site Visit (ES): Details ES updated tubing/plumbing in EC155 (note, the CSAT3A boom might have been moved) |
13JD44Site Visit (MR): Details MR downloaded data/photos |
14JD45 |
15JD46 |
16JD47 |
17JD48 |
18JD49 |
19JD50Chinese New Year (Wood Sheep) |
20JD51Site Visit (SpB): Details , Photos (23) Span cylinder at 40 --> 1800 psi. N2 at 250 --> 1850 psi at approx 10:30 MST, removed cc316422 (n2) started cc197414 at 1850 psi at approx 10:30 MST, removed cc254814 (span) started cc185237 (dave bowling cylincer) at 1800 psi at around 10:00 MST, disconnected power from LI-7500A OP1 swapped SD card from tower-base cam SpB Jeep clear in early AM, then heavy snow |
21JD52 |
22JD53 |
23JD54SpB Off |
24JD55 |
25JD56 |
26JD57significant snow |
27JD58 |
28JD59at 21:27 MST, started ops75: changed EOL CSAT3s to 60-Hz sample rate |