Previous | Calendar |
July |
2013 |
Next | ||
---|---|---|---|---|---|---|
Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday |
30JD181 |
1JD182Site Visit (SpB, PB, SM): Details , Photos (27) Span cylinder at ? psi. N2 at 1500 psi from 15:45-16:30 MST, extended boom for LI-7500 (now near CSAT3) from 16:30-19:00 MST, reinstalled LI-7200 (at 21.5m) heater settings for the LI-7200 inlet tubing: 3.8 W (0.21A, 18V) SM Van! Cool and cloudy; felt like it would rain (never did) |
2JD183SpB Off |
3JD184 |
4JD185Independence Day (CU Holiday) the response of T_ref (AM25T/mux1, connected to TC logger) changed dramatically |
5JD186 |
6JD187Site Visit (SM): Details at 16:00 MST, SM turned off the heater for LI-7200 inlet tubing |
7JD188 |
8JD189 |
9JD190 |
10JD191SpB Returns |
11JD192Site Visit (SpB, JVS, K, +): Details , Photos (32) Span cylinder at 300 psi. N2 at 1230 psi at 10:54 MST, turned on the heater for LI-7200 inlet tubing (5 W, 0.23 A, 21.3 V) from 11:50-12:25 MST, adjusted LI-6251 and swapped dessicant tube (restricted flow) NOTE: 2.5 m REBs has a crack in the dome (need to replace) SpB Jeep Pleasant; a few clouds and a threat of rain |
12JD193 |
13JD194network to tower is up-and-down (power seems ok) Water ingested by LI-7200 Afternoon T-storms |
14JD195 |
15JD196 |
16JD197Site Visit (SpB, JVS, K, MW, +): Details , Photos (31) Span cylinder at 300 psi. N2 at ? psi from 12:04-12:50 MST, swapped the LI-7200 inlet tube, cleaned the LI-7200 cell/optics (left heater at 5 W, 0.23 A, 21.3 V) from 16:00-16:15 MST, replaced 2.5m REBS domes (the upper one was broken) at 16:20 MST, reset gfi outlet (for Picarro) LTER Site Review SpB Jeep Pleasant/cool; a few clouds higher up, smog on plains |
17JD198 |
18JD199Site Visit (SpB, ES, LJ, GB, RK, DM, +): Details , Photos (19) Span cylinder at ? psi. N2 at ? psi in morning, students setup campbell instruments near trailer at C1 in afternoon, visit to tower is cut short by heavy rain MRS Flux Class to visit Tower SpB Jeep Sun in the morning; large clouds and heavy rain in afternoon |
19JD200 |
20JD201 |
21JD202at approx 19:00 MST, dry air passes by tower? |
22JD203 |
23JD204Site Visit (SpB, SC, SB): Details , Photos (25) Span cylinder at 200 psi. N2 at 900 psi at 9:00 MST, reset gfi outlet (for Picarro) at 9:20 MST, increased the LI-7200 heated inlet power to 6 W (0.27 A, 23.7 V) at 10:10 MST, krypton hygrometer re-deployed AmeriFlux IC (setup) CU Prius Warm and dry |
24JD205 |
25JD206 |
26JD207 |
27JD208 |
28JD209Wet and cool (in morning) |
29JD210 |
30JD211 |
31JD212Site Visit (JK, SC): Details at 9:00 MST, picarro unplugged? |
1JD213 |
2JD214Site Visit (SpB, SC): Details , Photos (28) Span cylinder at 80 --> 1900 psi. N2 at 650 psi at 9:30 MST, swapped span cylinder; old=cc32558 new=cc321228 from approx 10:30-10:45 MST, Changed profiler (li-6251) dessicant at 11:10 MST, swapped upper dessicant bottle in LI-7200 (no other changes) AmeriFlux IC (end) SpB Jeep Warm and Windy (esp in morning) |
3JD215 |