Previous

Calendar

January

2012

Next
Sunday Monday Tuesday Wednesday Thursday Friday Saturday

1

JD1

2

JD2
CU Holiday

3

JD3
Network to tower DOWN (work done on network at MRS)

4

JD4

5

JD5

6

JD6

7

JD7

8

JD8
SpB Returns

9

JD9
(Full "Wolf" Moon)

10

JD10
at 12:30 MST, Network to tower back UP

11

JD11

12

JD12
Site Visit (SpB): Details , Photos (28)

Span cylinder at 600 psi. N2 at 1250 psi

downloaded all logger data

Windy and cold.

13

JD13

14

JD14
Site Visit (MB): Details

15

JD15

16

JD16
CU Holiday (MLK, Jr. Day)

17

JD17

18

JD18
Strong downslope winds (in Boulder).

19

JD19
Strong downslope winds.

20

JD20

21

JD21

22

JD22

23

JD23

24

JD24
GTP Meeting (10am)

at 13:20 MST, Reset clock on the LI-7200

25

JD25

26

JD26

27

JD27

28

JD28

29

JD29

30

JD30

31

JD31

1

JD32

2

JD33

3

JD34
Snowstorm (approx 2' snow).

(note, co2.li7200 changed quite a bit during the day...why?)

4

JD35
Site Visit (SpB): Details , Photos (0)

Span cylinder at 490 psi. N2 at 900 psi

Trip to T-van to service NWR AIRCOA: photos (30)

Both in-canopy CSATs were loaded with snow (cleaned out the 2.5m CSAT, but not 5.7m)

Lots of Snow.