Previous | Calendar |
January |
2012 |
Next | ||
---|---|---|---|---|---|---|
Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday |
1JD1 |
2JD2CU Holiday |
3JD3Network to tower DOWN (work done on network at MRS) |
4JD4 |
5JD5 |
6JD6 |
7JD7 |
8JD8SpB Returns |
9JD9(Full "Wolf" Moon) |
10JD10at 12:30 MST, Network to tower back UP |
11JD11 |
12JD12Site Visit (SpB): Details , Photos (28) Span cylinder at 600 psi. N2 at 1250 psi downloaded all logger data Windy and cold. |
13JD13 |
14JD14Site Visit (MB): Details |
15JD15 |
16JD16CU Holiday (MLK, Jr. Day) |
17JD17 |
18JD18Strong downslope winds (in Boulder). |
19JD19Strong downslope winds. |
20JD20 |
21JD21 |
22JD22 |
23JD23 |
24JD24GTP Meeting (10am) at 13:20 MST, Reset clock on the LI-7200 |
25JD25 |
26JD26 |
27JD27 |
28JD28 |
29JD29 |
30JD30 |
31JD31 |
1JD32 |
2JD33 |
3JD34Snowstorm (approx 2' snow). (note, co2.li7200 changed quite a bit during the day...why?) |
4JD35Site Visit (SpB): Details , Photos (0) Span cylinder at 490 psi. N2 at 900 psi Trip to T-van to service NWR AIRCOA: photos (30) Both in-canopy CSATs were loaded with snow (cleaned out the 2.5m CSAT, but not 5.7m) Lots of Snow. |