Previous

Calendar

September

2011

Next
Sunday Monday Tuesday Wednesday Thursday Friday Saturday

28

JD240

29

JD241

30

JD242

31

JD243

1

JD244

2

JD245
Site Visit (SpB, MW, DN, M, A, +): Details , Photos (2)

Span cylinder at 600 psi. N2 at 900 psi

in AM: trip to T-van to service NWR AIRCOA: photos (34)

Cool and pleasant.

3

JD246

4

JD247

5

JD248
CU Holiday (Labor Day)

6

JD249

7

JD250

8

JD251

9

JD252

10

JD253
Site Visit (SpB): Details , Photos (28)

Span cylinder at 500 psi. N2 at 700 psi

Added LI-7200 to tower

from approx 15:39-15:51 MST, Changed profiler (li-6251) dessicant

Some Cu. Perfect Fall day.

11

JD254

12

JD255

13

JD256

14

JD257

15

JD258
SpB Off

16

JD259

17

JD260

18

JD261

19

JD262

20

JD263
SpB Returns

21

JD264

22

JD265
Fall Equinox

23

JD266
Site Visit (SpB, NT, B, JL, CG, +): Details , Photos (16)

Span cylinder at 400 psi. N2 at 400 psi

Power shutdown from approx 9:20-11 AM (to add new power line to girdle shed).

Moved LI-7200 to 21.5m (not finished)

Calm. Warm. Perfect Fall day (Aspens bright yellow).

24

JD267
Site Visit (SpB, NT, HB, A, +): Details , Photos (26)

Span cylinder at 400 psi. N2 at 370 psi

Holly brought up her forest ecol class for a site visit

Finished moving LI-7200 to 21.5m

REBS at 2.5m had a crack in upper dome, lower dome filled with water!

Warm. Nice.

25

JD268

26

JD269

27

JD270

28

JD271

29

JD272
Site Visit (DB, JL, +): Details

from 9-11 MST, power to tower was down for beatle shed hookup

SpB Off

30

JD273
Site Visit (DB, JL, +): Details

from 10:45-1300 MST, power to tower was down for beatle shed hookup

1

JD274
SpB Returns