Previous

Calendar

July

2011

Next
Sunday Monday Tuesday Wednesday Thursday Friday Saturday

26

JD177

27

JD178
Site Visit (SpB, NT, DB, E, B): Details , Photos (28)

Span cylinder at 1190 psi. N2 at 1100 psi

Tref in am25t "A" connected to TC logger is way off (need to look into this, when did problem start?)

from 11:15-11:50 MST, moved P sensor "B8" from 21.5m to near the ground

from approx 12:12-12:32 MST, Changed profiler (li-6251) dessicant

Cool and breezy in morning, cleared up, then clouded up again in afternoon. Snow is gone, creek is high.

CU Jeep

DB at site (entire week)

28

JD179
at around 9:00 MDT, ati k-probe stops working.

29

JD180

30

JD181

1

JD182

2

JD183

3

JD184

4

JD185
Independence Day

5

JD186

6

JD187

7

JD188

8

JD189
Site Visit (SpB, NT, E, B): Details , Photos (37)

Span cylinder at 1100 psi. N2 at 890 psi

at approx 10:00 MST, power-cycled the ATI k-probe (this fixed the problem)

at approx 10:30 MST, modified orientation of krypton hygrometer

from 11:00-11:40 MST, removed eol P sensors and data system

from 13:50-14:15 MST, replaced 3 lowest inlet filters for co2 profile system

Sunny in morning, threat of rain, then cleared up, then clouded up again in afternoon.

CU Suburban

9

JD190
Stardot camera and forestcam both off-line (problem with black box fiber-to-copper converter)

10

JD191
Short power outage (Sun Jul 10 14:19:06 MDT 2011, 152 seconds)

11

JD192

12

JD193

13

JD194

14

JD195
at around 15:30 MST, power outage at the site; data system down

15

JD196
Site Visit (SpB): Details , Photos (14)

Span cylinder at 1010 psi. N2 at 700 psi

from 11:10-11:40 MST, replaced domes on REBS 25.5m Rnet sensor

network problem to forestcam is due to a network converter failure (see notes)

Sunny and warm. Some Cu in the afternoon.

CU Prius

16

JD197

17

JD198
Short power outage (2011-07-17 15:48:22 -0600, 5 seconds)

ati k-probe stops working (again?).

18

JD199
Start of the NSF "Flux" class at MRS.

19

JD200
Short power outage (2011-07-19 13:46:07 MDT, 10 seconds)

ati k-probe starts working (probably due to power reset).

20

JD201

21

JD202
Site Visit (SpB, RM, + flux class): Details , Photos (11)

Span cylinder at 1000 psi. N2 at 590 psi

22

JD203

23

JD204
SpB Off

24

JD205

25

JD206

26

JD207

27

JD208
At approx mid-day, the 1.6m 2-D handar stops working

28

JD209

29

JD210
End of the NSF "Flux" class at MRS.

30

JD211
SpB Returns

31

JD212

1

JD213

2

JD214
Site Visit (SpB, E, B): Details , Photos (29)

Span cylinder at 900 psi. N2 at 200 psi --> 1700 psi

From 10:15-10:30 MST, swapped N2 cylinder; old=cc302236, new=cc301525

from approx 9:33-9:50 MST, Changed profiler (li-6251) dessicant

At approx 10:30 MST, fixed thermocouple T7 (3rd level AGL).

At approx 10:45 MST, swiped krypton hygrometer

Cool and cloudy, some rain. Supposed to be a BIG storm (that never happened)

CU Prius

3

JD215
SpB to SPL

4

JD216
SpB to SPL
SPL photos

5

JD217

6

JD218