Previous

Calendar

April

2011

Next
Sunday Monday Tuesday Wednesday Thursday Friday Saturday

27

JD86

28

JD87

29

JD88

30

JD89

31

JD90
Windy.

1

JD91

2

JD92

3

JD93

4

JD94
look at T7/T8 at 7:35 MST (much warmer than others, b/c they are in the snow!? T7 might be broken).

5

JD95
PB lab meeting (2-3pm).

6

JD96
Site Visit (SpB): Details , Photos (21)

Span cylinder at 200 psi. N2 at 0 psi.---> 1900 psi

From 9:30-11:00 MST, swapped N2 cylinder; old= cc262287, new=cc17742

calibrated two span cylinders in the afternoon (cc240401 and cc140852)

Foggy in the morning, above the fog (ie, sunny) in the mid-day.

CU Malibu

7

JD97
SpB Off

8

JD98

9

JD99

10

JD100

11

JD101
place order for RBC33 (UPS Battery).

12

JD102
SpB Returns

13

JD103

14

JD104
at 9:10 MST, brief (2 second) power outage

spring snowstorm.

15

JD105

16

JD106

17

JD107

18

JD108
small pump for the li-6251 profile system stops working.

19

JD109

20

JD110
Site Visit (SpB): Details , Photos (25)

Span cylinder at 20 psi --> 1800 psi. N2 at 1510 psi

From 9:30-11:00 MST, swapped span cylinder; old= cc153480, new=cc140852

from 10:15-10:45 MST, replaced KNF micropump for the li-6251 profile system.

Snowing in the morning, but above the clouds (ie, sunny) the rest of the day. Wet, dripping snow.

SpB Jeep

21

JD111

22

JD112

23

JD113

24

JD114

25

JD115
SpB at SPL

26

JD116

27

JD117

28

JD118

29

JD119

30

JD120