Previous | Calendar |
January |
2011 |
Next | ||
---|---|---|---|---|---|---|
Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday |
26JD360 |
27JD361 |
28JD362 |
29JD363 |
30JD364SpB Returns |
31JD365Site Visit (SpB): Details , Photos (6) russter2 is up and collecting data (eth0 network card not working); problem not fixed until 6 January Extreme cold. Windy and blowing snow. SpB Jeep |
1JD1Extreme cold. |
2JD2 |
3JD3 |
4JD4 |
5JD5 |
6JD6Site Visit (SpB, JC): Details , Photos (22) Span cylinder at 1200 psi. N2 at 1000 psi. Jesse et al determined the eth0 problem was that the russter2 IP was being blocked. (to fix, changed IP) at 12:40 MST, adjusted cal gas flows in LI-6262 Gusty. Just below freezing. CU Prius |
7JD7 |
8JD8 |
9JD9 |
10JD10 |
11JD11 |
12JD12 |
13JD13Site Visit (SpB): Details , Photos (23) Span cylinder at 1150 psi. N2 at 800 psi. at 12:15 MST, adjusted cal gas flows in LI-6262 (and re-zeroed co2/h2o) from 14:12-14:27 MST, Changed profiler (li-6251) dessicant Variable winds. Just above freezing. CU Prius |
14JD14 |
15JD15 |
16JD16 |
17JD17 |
18JD18GTP Meeting (NCAR) |
19JD19 |
20JD20 |
21JD21 |
22JD22 |
23JD23 |
24JD24 |
25JD25 |
26JD26Site Visit (SpB): Details , Photos (10) Span cylinder at 1000 psi. N2 at 400 psi. made trip to T-van with AW to service NWR AIRCOA: photos (44) Calm and sunny in the morning; Winds picked up in afternoon. EOL Jeep |
27JD27SpB Off |
28JD28 |
29JD29 |
30JD30 |
31JD31 |
1JD32Extreme cold. SpB Returns |
2JD33at 00:40 MST, quacker crashes (data system down) |
3JD34 |
4JD35Site Visit (SpB, DL): Details , Photos (19) Span cylinder at 850 psi. N2 at 0 psi.---> 1850 psi at 11:30 MST, rebooted the quacker (data system back up) From 12:00-13:00 MST, swapped N2 cylinders; old= cc282442, new= cc262287 Calm and overcast. Periodic light snowfall. CU Prius |
5JD36 |