Previous

Calendar

January

2011

Next
Sunday Monday Tuesday Wednesday Thursday Friday Saturday

26

JD360

27

JD361

28

JD362

29

JD363

30

JD364
SpB Returns

31

JD365
Site Visit (SpB): Details , Photos (6)

russter2 is up and collecting data (eth0 network card not working); problem not fixed until 6 January

Extreme cold. Windy and blowing snow.

SpB Jeep

1

JD1
Extreme cold.

2

JD2

3

JD3

4

JD4

5

JD5

6

JD6
Site Visit (SpB, JC): Details , Photos (22)

Span cylinder at 1200 psi. N2 at 1000 psi.

Jesse et al determined the eth0 problem was that the russter2 IP was being blocked. (to fix, changed IP)

at 12:40 MST, adjusted cal gas flows in LI-6262

Gusty. Just below freezing.

CU Prius

7

JD7

8

JD8

9

JD9

10

JD10

11

JD11

12

JD12

13

JD13
Site Visit (SpB): Details , Photos (23)

Span cylinder at 1150 psi. N2 at 800 psi.

at 12:15 MST, adjusted cal gas flows in LI-6262 (and re-zeroed co2/h2o)

from 14:12-14:27 MST, Changed profiler (li-6251) dessicant

Variable winds. Just above freezing.

CU Prius

14

JD14

15

JD15

16

JD16

17

JD17

18

JD18
GTP Meeting (NCAR)

19

JD19

20

JD20

21

JD21

22

JD22

23

JD23

24

JD24

25

JD25

26

JD26
Site Visit (SpB): Details , Photos (10)

Span cylinder at 1000 psi. N2 at 400 psi.

made trip to T-van with AW to service NWR AIRCOA: photos (44)

Calm and sunny in the morning; Winds picked up in afternoon.

EOL Jeep

27

JD27
SpB Off

28

JD28

29

JD29

30

JD30

31

JD31

1

JD32
Extreme cold.

SpB Returns

2

JD33
at 00:40 MST, quacker crashes (data system down)

3

JD34

4

JD35
Site Visit (SpB, DL): Details , Photos (19)

Span cylinder at 850 psi. N2 at 0 psi.---> 1850 psi

at 11:30 MST, rebooted the quacker (data system back up)

From 12:00-13:00 MST, swapped N2 cylinders; old= cc282442, new= cc262287

Calm and overcast. Periodic light snowfall.

CU Prius

5

JD36