Report Jeep Mileage to Lease Operations

Heavy Fog/Overcast.

29

JD210
Site Visit (SpB, AJ): Details , Photos (29)

Span cylinder at 1500 psi. N2 at 1120 psi.

Added a T/RH sensor from EOL (currently setup at 188 cm) to prof logger (start using prf_02.csi)

Added SDM output from the LI-7500 at 2.5m, uc23x logger starts using uc_02.csi (note: this change causes data output rate to be at 5 Hz, not 10 Hz)

Foggy/overcast with some rain.

30

JD211
(note: csat at 21.5m was not working most of the day due to fog/rain)

at 9:10 MST, started ops50; new LI-7500 variables from uc23x + T ("o3.slow") and RH (RH.eol) from eol T/RH sensor

Foggy.

31

JD212
Jeep gets a flat tire (LL)

1

JD213

2

JD214

3

JD215
Note: cell pressure & flow rate during the LI-6262 cals is way off (it's been like this since last week)....

4

JD216
Site Visit (SpB, SL, LY, DA, CG, AJ): Details , Photos (25)

Span cylinder at 1480 psi. N2 at 1050 psi.

at 9:44 MST, started ops51; analog outputs from 2.5m LI-7500 no longer saved.

uc23x logger starts using uc_03.csi (note: this change causes data output rate from 5 Hz to 10 Hz, no 5-min data saved at the logger)

changed the internal (digital) filter on both LI-7500s from 5-hz to 20-hz (ie, no filter)

replaced the internal 6V batteries in both the CNR and MET cr23x loggers (the one in MET logger was dead)

Sunny and dry (some Cu and high cirrus around).

5

JD217
(Full "Sturgeon" Moon)

6

JD218

7

JD219

8

JD220

9

JD221
Site Visit (SpB, DA): Details , Photos (21)

Span cylinder at 1400 psi. N2 at 900 psi.

from 10:30-11:00 MST, Changed profiler (li-6251) dessicant

at 10:15 MST, removed krypton hygrometer

Sunny, but quite cool (and gusty).

10

JD222

11

JD223
between approx 1:00-3:00 MST, power outage at the site; data system down

at 3:00 MST, russter reboots itself and restarts the data system (quacker is ok).

LI-6262 turns off during the power outage; does not turn itself back on!!

SpB Off

12

JD224

13

JD225

14

JD226

15

JD227

16

JD228

17

JD229

18

JD230

19

JD231

20

JD232

21

JD233

22

JD234

23

JD235

24

JD236
SpB Returns (late in the day)

25

JD237
Site Visit (SpB, LL, SO): Details , Photos (11)

Span cylinder at 1250 psi. N2 at 490 psi.

at 9:00 MST, LI-6262 power-cycled (now back up and running).

Cool, calm and BIG towering Cu clouds.

26

JD238

27

JD239
Report Jeep Mileage to Lease Operations

28

JD240

29

JD241

30

JD242

31

JD243

1

JD244
Site Visit (SpB, DA, DB, AT, T): Details , Photos (27)

Span cylinder at 1200 psi. N2 at 300 psi.

removed loaner LI-6262 (sn IRG3-224); re-installed our re-calibrated LI-6262 (sn IRG3-0638)

meet Joe Lanzoni at 8:40 at MRS.

Smoke/Haze from fires (california?) is evident.