28JD209Report Jeep Mileage to Lease Operations Heavy Fog/Overcast. |
29JD210Site Visit (SpB, AJ): Details , Photos (29) Span cylinder at 1500 psi. N2 at 1120 psi. Added a T/RH sensor from EOL (currently setup at 188 cm) to prof logger (start using prf_02.csi) Added SDM output from the LI-7500 at 2.5m, uc23x logger starts using uc_02.csi (note: this change causes data output rate to be at 5 Hz, not 10 Hz) Foggy/overcast with some rain. |
30JD211(note: csat at 21.5m was not working most of the day due to fog/rain) at 9:10 MST, started ops50; new LI-7500 variables from uc23x + T ("o3.slow") and RH (RH.eol) from eol T/RH sensor Foggy. |
31JD212Jeep gets a flat tire (LL) |
1JD213 |
2JD214 |
3JD215Note: cell pressure & flow rate during the LI-6262 cals is way off (it's been like this since last week).... |
4JD216Site Visit (SpB, SL, LY, DA, CG, AJ): Details , Photos (25) Span cylinder at 1480 psi. N2 at 1050 psi. at 9:44 MST, started ops51; analog outputs from 2.5m LI-7500 no longer saved. uc23x logger starts using uc_03.csi (note: this change causes data output rate from 5 Hz to 10 Hz, no 5-min data saved at the logger) changed the internal (digital) filter on both LI-7500s from 5-hz to 20-hz (ie, no filter) replaced the internal 6V batteries in both the CNR and MET cr23x loggers (the one in MET logger was dead) Sunny and dry (some Cu and high cirrus around). |
5JD217(Full "Sturgeon" Moon) |
6JD218 |
7JD219 |
8JD220 |
9JD221Site Visit (SpB, DA): Details , Photos (21) Span cylinder at 1400 psi. N2 at 900 psi. from 10:30-11:00 MST, Changed profiler (li-6251) dessicant at 10:15 MST, removed krypton hygrometer Sunny, but quite cool (and gusty). |
10JD222 |
11JD223between approx 1:00-3:00 MST, power outage at the site; data system down at 3:00 MST, russter reboots itself and restarts the data system (quacker is ok). LI-6262 turns off during the power outage; does not turn itself back on!! SpB Off |
12JD224 |
13JD225 |
14JD226 |
15JD227 |
16JD228 |
17JD229 |
18JD230 |
19JD231 |
20JD232 |
21JD233 |
22JD234 |
23JD235 |
24JD236SpB Returns (late in the day) |
25JD237Site Visit (SpB, LL, SO): Details , Photos (11) Span cylinder at 1250 psi. N2 at 490 psi. at 9:00 MST, LI-6262 power-cycled (now back up and running). Cool, calm and BIG towering Cu clouds. |
26JD238 |
27JD239Report Jeep Mileage to Lease Operations |
28JD240 |
29JD241 |
30JD242 |
31JD243 |
1JD244Site Visit (SpB, DA, DB, AT, T): Details , Photos (27) Span cylinder at 1200 psi. N2 at 300 psi. removed loaner LI-6262 (sn IRG3-224); re-installed our re-calibrated LI-6262 (sn IRG3-0638) meet Joe Lanzoni at 8:40 at MRS. Smoke/Haze from fires (california?) is evident. |
2JD245 |
3JD246 |
4JD247(Full "Corn" Moon) |
5JD248 |