Previous

Calendar

December

2009

Next
Sunday Monday Tuesday Wednesday Thursday Friday Saturday

29

JD333
SpB returns

30

JD334
Site Visit (SpB): Details , Photos (21)

Span cylinder at 300 psi. N2 at 1700 psi

at ~11:20 MST, moved plugs for LI-CORs from "battery backup" to "surge protected".

at ~12:00 MST, check flows in LI-6262

moved pressure inlets for two P-sensors in UCB logger

Warm for Nov. Gusty at time, but mostly calm conditions. Clear in the morning, then high clouds moved in.

Compact Rental

1

JD335

2

JD336
(Full "Cold" Moon)

Snow at the site.

3

JD337
Extremely cold conditions at the site (Esp the early morning of Dec 3).

4

JD338

5

JD339

6

JD340

7

JD341

8

JD342
Extremely cold conditions.

9

JD343
Extremely cold conditions.

10

JD344
Site Visit (SpB, DG): Details , Photos (4)

Span cylinder at 100 psi. N2 at 1250 psi

at ~13:45 MST, check flows in LI-6262

DG was setting up poles/mounts near snotel.

Very Cold (laptop was frozen!). Very windy. Below zero degC the entire week.

NCAR Jeep Rental

11

JD345
Monson Lab Holiday Party

12

JD346
SpB off (AGU)

13

JD347

14

JD348

15

JD349

16

JD350

17

JD351

18

JD352
SpB returns

19

JD353
Site Visit (SpB, RB): Details , Photos (11)

Span cylinder at 1590 psi. N2 at 1050 psi

at ~11:40 MST, swapped span gas (old cylinder=CC245057 at 50 psi, new cylinder= CC282352, at 1590 psi)

from 12:50-13:15 MST, Changed profiler (li-6251) dessicant

at ~13:35 MST, checked flows in LI-6262

Removed the 2-d ATI from the tower for lab testing

Blustery at times; high cirrus clouds with a Tair near 0C.

Prius Rental

20

JD354

21

JD355
Winter Solstice
SpB off

22

JD356

23

JD357

24

JD358

25

JD359

26

JD360

27

JD361

28

JD362

29

JD363

30

JD364

31

JD365

1

JD1

2

JD2