27JD270Site Visit (SpB): Details , Photos (24) Span cylinder at 820 psi. N2 at 1490 psi mounted EOL csat-3 (sn 0674) at 11:00 MST, started ops52/ops53; collecting eol csat3, accelerometer data no longer saved (after a few adjustments). started running "fast_10.csi" in fast cr23x logger moved EOL T/RH sensor up to 4.6m A bit breezy in the morning, but calm and warm most of the day (very dry). |
28JD271 |
29JD272 |
30JD273 |
1JD274at approx 13:00 MST, power outage, data system goes down |
2JD275Site Visit (SpB): Details , Photos (25) Span cylinder at 750 psi. N2 at 1260 psi at 9:30 MST, rebooted quacker (data system back up) from 11:20-11:47 MST, Changed profiler (li-6251) dessicant removed the KZ PAR-LITE sensor (PAR2.up) from the CNR logger moved EOL T/RH sensor up to 8m re-connected noahs snow depth logger and confirmed it was running Very windy in the morning, but calm in the afternoon (very dry). |
3JD276 |
4JD277(Full "Harvest" Moon) |
5JD278TRAM teardown week |
6JD279Site Visit (SpB, LL, SO, KK, C, etc): Details , Photos (14) Span cylinder at 700 psi. N2 at 1200 psi helped move TRAM parts removed extention cords and battery at West Robot worked on grove2 (PAR teardown) Very windy and cool in the morning, but calm in the afternoon. |
7JD280 |
8JD281 |
9JD282 |
10JD283Summer Jeep Rental (ends) |
11JD284 |
12JD285 |
13JD286Yom Kippur |
14JD287 |
15JD288 |
16JD289Site Visit (SpB, NT, DA, LY, CG, TD, NM, DG, PB, +): Details , Photos (18) Span cylinder at 710 psi. N2 at 900 psi moved UC radiation sensors back to mini-tower re-connected UCB pressure sensor (ASCX15AN) re-connected the mrs logger and resent the program (mrs_02.csi) from 13:53-13:55, adjusted span/n2 flow rates for LI-6262 |
17JD290 |
18JD291 |
19JD292 |
20JD293 |
21JD294 |
22JD295 |
23JD296 |
24JD297 |
25JD298 |
26JD299Site Visit (SpB, JS, T, A, P): Details Span cylinder at 680 psi. N2 at 600 psi Site visit with visitors from Taiwan. 3-4" of Fresh snow. Windy and Cold. |
27JD300Site Visit (AT): Details REA system removed from tower; also slow ozone sensor taken to NCAR for checking (AT). |
28JD301Heavy Snow. |
29JD302Heavy Snow. |
30JD303 |
31JD304Site Visit (SpB): Details , Photos (25) Span cylinder at 520 psi. N2 at 550 psi from 13:12-13:28 MST, Changed profiler (li-6251) dessicant Sunny and windy (at times). Prius Rental Halloween |