Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday |
25JD329 |
26JD330 |
27JD331mailed PAR-Lite sensor (s/n 060859) back to OSU |
28JD332 |
29JD333 (cold, windy)Site Visit (JB, JH): Details see details for map of hydra inlet (US1, US2, UN1, UN2) locations downloaded from the soil and tc loggers, swapped the pc card at the cr10_mrs logger snow depths: facing north, l=9cm, middle=10cm, r=4cm swapped 4 flasks at the west robot checked on the span and N2 cylinders at the tower (span@350 psi, N2@850 psi) brushed snow off of quacker's box, the soil, tc, noah and mrs logger boxes, and some other boxes on the cuff tower confirmed the Netgear switch is in the trailer checked the network cable connections for the tower network and the network to the world at russter2 Jia was collecting needle and phloem samples SpB Off |
30JD334 |
1JD335 |
2JD336 |
3JD337 |
4JD338SpB Returns |
5JD339 |
6JD340 |
7JD341 |
8JD342 |
9JD343Site Visit (SpB): Details , Photos (17) at MRS cr10 logger---reconnected the pcmcia external card storage (with a card). Note, sample pump (knf UNMP30 KNI) for the profile system was showing a low flow rate. |
10JD344 |
11JD345 |
12JD346 |
13JD347Site Visit (JB, SpB): Details , Photos (14) downloaded from cnr, prof, met, nctc, soil, tcs, noah, ucb, and ucan at MET logger: started running met_06.csi (output of prop-vane data in physical units (m/s and deg, not mV)). swapped pc cards at the mrs logger cleaned krypton optics changed the profiler pump; swapped the UNMP30 KNI (s/n 1/761551) for a new UNMP30 KNI swapped N2 cylinder CC125555 @ 400 psi with CC198536 @ 1750 psi swapped span cylinder CC240435 @ 200 psi with Scott-Marrin CC66823 @ ~450 psi when we swapped span cylinders we noticed a leak in the cal system, possibly at the regulator or somewhere downstream of the regulator. Plan of attack for next site visit is to replace the cal system's dekabon tubing, maybe fittings and unions also, or at least check that they are tight |
14JD348 |
15JD349 |
16JD350at 4:02 MST, russter2 locks up and the data system goes down. |
17JD351Site Visit (JB): Details at 10:48 am MST, russter2 rebooted and data system restarted. swapped 4 flasks at the robot rebooted russter2 @ ~1:15 pm for minor OS upgrade |
18JD352 |
19JD353SpB Off |
20JD354at 23:16 MST, russter2 has I/O problems and the data system goes down. |
21JD355Winter Solstice JB goes to MA through 1/6/08 russter2 down. |
22JD356russter2 down. |
23JD357russter2 down. |
24JD358CU Holiday (x-mas eve) russter2 down. |
25JD359CU Holiday (x-mas) russter2 down. |
26JD360russter2 down. |
27JD361russter2 down. |
28JD362SpB Returns russter2 down. |
29JD363Site Visit (SpB, EL-T): Details , Photos (3) at 12:16 MST, russter2 rebooted and data system re-started. |
30JD364 |
31JD365 |
1JD1CU Holiday (New Years Day) |
2JD2Site Visit (JH, RJ): Details at 4:02 MST, russter2 locks up and the data system goes down. at 10:40 MST, russter2 rebooted and data system back up. at 13:20 MST, russter2 locks up (again) and the data system goes down. |
3JD3 (warm)Site Visit (SpB): Details , Photos (16) at 10:15 MST, russter2 rebooted (data system not started). at 17:00 MST, russter2 removed from trailer and brought to campus. Prius Rental |
4JD4 (windy)Site Visit (SpB, NT, SL): Details at 16:30 MST, russter2 returned to trailer, rebooted, and data system re-started. Jeep Rental |
5JD5 |