Previous | Calendar |
October |
2007 |
Next | ||
---|---|---|---|---|---|---|
Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday |
30JD273First significant snowfall (on Sat night). |
1JD274 |
2JD275More snow (Mon night) + strong winds. |
3JD276Site Visit (JB, MP, AW, MW, JM, LL): Details removed photo diode wands |
4JD277Site Visit (JB, MP, SpB, NT, SL): Details , Photos (17) reboot of russter2 ~10:00 MDT swapped four flasks, done=2; switched robot program to semi-winter mode (seasonal flag=1, collects 4 flasks every week) moved ATI 2-d sonic from 20cm to tower @ ~9m from 13:40-14:10 MST: Finished blow-testing the HYDRA inlets |
5JD278 |
6JD279 |
7JD280 |
8JD281Site Visit (SO+): Details Columbus Day |
9JD282Site Visit (JB, SpB, MP, NT): Details , Photos (11) from 9:30-10:00 MST: hydra gast pump off, switched around inlet connections (see details) at ~9:30 MST, added KZ PAR-LITE sensor as PAR2.up to CNR logger at 11:30 MST, removed a pair of bugs stuck in the rain gauge from 11:17-11:55 MST, replaced 2 micron Nupro filters for the LI-6262 and re-zeroed the LI-6262 from 13:30-13:50 MST, fixed up bottom three thermocouples downloaded from cnr, prof, met, nctc, soil, tcs, ucan, and ucb |
10JD283Site Visit (JB, SpB, MW, SO+): Details , Photos (5) at ~12:30 MST: HYDRA data system shuts down. at 13:30 MST, NCAR TC cr23x logger stops working at around 12:00 MST, reconnected refurbished 16m prop-vane started hauling TRAM gear to new transect |
11JD284Site Visit (JB, SpB, NT, AP, AT, SO+): Details at 22:30 MST: HYDRA data system back up. swapped four flasks hauled more TRAM gear |
12JD285Site Visit (JB, SpB, RaM, SO+): Details , Photos (6) at 12:45 MST: HYDRA shutdown and removed from site. removed NCAR TC cr23x logger to send back for repairs. swapped mag. perch. trap and indicator tube for the 6251 @ ~12:20 MDT all TRAM towers erected and guyed at the new transect |
13JD286 |
14JD287Heavy snowfall. |
15JD288MP and AW take the gray Jeep to the PJ woodlands in southern CO to collect more caterpillars |
16JD289Site Visit (JB, SpB, LL, NT, C, DB, JM): Details , Photos (19) removed the KZ PAR-LITE sensor (PAR2.up) from the CNR logger @ ~15:00 MDT we changed the nupro filter on the LI-6251 and swapped the mag. perch. trap and indicator tube |
17JD290Ameriflux Meeting (at Boulderado Hotel) |
18JD291 (windy)Site Visit (JB, MP, JH, NT, AW, Mike): Details swapped 4 flasks, moved lowest inlet to top of green metal bar in the ground very windy, ~zero degrees C, ~4 inches new snow. Ameriflux Meeting (at Boulderado Hotel) |
19JD292Ameriflux Meeting (at Boulderado Hotel) |
20JD293Site Visit (DB): Details |
21JD294 |
22JD295Site Visit (JH, MP): Details TIMES retreat (SpB off) |
23JD296TIMES retreat (SpB off) |
24JD297 (warm, sunny)Site Visit (JB, MP, JH): Details downloaded from soil and Tcs N2 @ 400 psi, span @ 700 psi discovered the CR10/MRS logger box was open and full or ice/water! |
25JD298 |
26JD299Site Visit (JB, SpB, SO): Details , Photos (4) lost about 3-4 hours of MET logger data on data system (this happend when we added a 2nd fiber optic converter to the quacker box for EOL/TRAM) at ~9:30 MST, the re-furbished NCAR TC cr23x logger re-installed on tower replaced the MRS cr10 logger with spare CR10 (from Jia). from 13:30-14:20 MST, at soil logger---stopped saving the "tdr" parameters, started saving all 25 am25t mux TC data, started running "soil_02.csi" |
27JD300 |
28JD301 |
29JD302Haze from CA fires present. |
30JD303Site Visit (JB, SpB, JH, NT): Details , Photos (13) rebooted isffa downloaded from all loggers BUT cnr replaced cable for the Rnet sensor at 2m on the mini tower; see details for more info tower N2 @ 350 psi at soil logger am25t mux---added 3 more TCs to the logger (now collecting data from all 25 TCs). setup the TCs near the snowtemp probes. |
31JD304Halloween |
1JD305Site Visit (JB, NT): Details worked on last snow fence plot swapped 4 flasks |
2JD306 |
3JD307 |