Previous | Calendar |
September |
2005 |
Next | ||
---|---|---|---|---|---|---|
Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday |
28JD240 |
29JD241 (clear/dry)Site Visit (SpB): Details , Photos (34) at 8:50 MST, li-6262 pump restored at ~9:30 MST, swiped krypton hygrometer at ~10:30 MST, removed KZ pyranometer sensor (returned to NCAR) at ~12:00 MST, moved all soil temperature sensors together at ~15:00 MST, orst prt temperature sensor added at 2m for comparison (to nctc logger, at tc_12) |
30JD242 (clear/dry)Site Visit (SpB, JH): Details , Photos (20) at 9:43 MST, Ozone Target Replaced |
31JD243 |
1JD244SpB Off |
2JD245Site Visit (KR): Details east/west robot flasks swapped (KR) |
3JD246 |
4JD247 |
5JD248 |
6JD249 |
7JD250Site Visit (SS, MW, JH, CXY, JM): Details LASER moved! |
8JD251 |
9JD252Site Visit (SS): Details |
10JD253Site Visit (SS, KR): Details east/west robot flasks swapped (KR) SpB Returns |
11JD254Parking Permit EXPIRES!! |
12JD255Site Visit (SpB, SS): Details , Photos (27) at ~12:00 MST, moved two TCs to the temperature IC area at ~12:30 MST, moved orst prt temperature sensor to be slightly above the 2m T/RH sensor connected the laser (tga) to the network/internet. |
13JD256First snowfall of the year (dusting). |
14JD257Site Visit (MW): Details soils sampled. (MW) |
15JD258Site Visit (SpB): Details , Photos (13) at ~12:30 MST, moved orst prt temperature sensor up to the 8m T/RH sensor at ~15:00 MST, added back one of the AM25Ts to the TC logger (start using tc_02.csi) return JEEP. |
16JD259Site Visit (AT): Details ozone target replaced. |
17JD260 |
18JD261 |
19JD262CO2 Experts Meeting (CU/UMC) |
20JD263Site Visit (SpB, LSD): Details , Photos (16) at ~9:40 MST, swiped krypton hygrometer at ~9:50 MST, switched span gas at the tower (from airgas CA02337 to S-M CC114714) at ~10:40 MST, added 257l soil wetness sensor to ucb logger (ucb_02.csi) at ~12:20 MST, connected all wires to the repaired AM25T (at the TC logger) |
21JD264CO2 Experts Meeting (CU/UMC) |
22JD265Fall Equinox Site Visit (SpB, JH, LSD, TR, RM, MW, NT, CK): Details , Photos (26) Tree Core/Needle/Bark Collections by Jia, et al. at ~11:00 MST, power problems at SOIL Logger, disconnected UCB and moved battery to soil logger. Suburban Rental |
23JD266added refurbished EXB-8505XLE tape drive to urquell |
24JD267Site Visit (KR): Details east/west robot flasks swapped (KR) |
25JD268 |
26JD269 |
27JD270Site Visit (SpB, MW): Details , Photos (23) Soils sampled (MW) at 10:00 MST, laser dewar topped off (from 17cm to 29cm) (SpB) from 10:16-10:50 MST, Changed profiler (li-6251) dessicant at ~11:00 MST, moved new battery out for SOIL logger at ~12:00 MST, reconnected UCB logger. |
28JD271 |
29JD272Site Visit (SpB, JH, NM, P, DA, RL): Details , Photos (18) at 10:35 MST, ozone target replaced. from 11:15-11:20 MST, swapped out the N2 cylinder from ~13:00-13:30 MST, buried soil matrix probe, new wire for 2m Rnet. Compact Rental |
30JD273 |
1JD274Site Visit (KR): Details laser dewar topped off (new level?) east/west robots, done=2, air flasks swapped (KR) |