Previous

Calendar

September

2005

Next
Sunday Monday Tuesday Wednesday Thursday Friday Saturday

28

JD240

29

JD241 (clear/dry)
Site Visit (SpB): Details , Photos (34)

at 8:50 MST, li-6262 pump restored

at ~9:30 MST, swiped krypton hygrometer

at ~10:30 MST, removed KZ pyranometer sensor (returned to NCAR)

at ~12:00 MST, moved all soil temperature sensors together

at ~15:00 MST, orst prt temperature sensor added at 2m for comparison (to nctc logger, at tc_12)

30

JD242 (clear/dry)
Site Visit (SpB, JH): Details , Photos (20)

at 9:43 MST, Ozone Target Replaced

31

JD243

1

JD244
SpB Off

2

JD245
Site Visit (KR): Details

east/west robot flasks swapped (KR)

3

JD246

4

JD247

5

JD248

6

JD249

7

JD250
Site Visit (SS, MW, JH, CXY, JM): Details

LASER moved!

8

JD251

9

JD252
Site Visit (SS): Details

10

JD253
Site Visit (SS, KR): Details

east/west robot flasks swapped (KR)

SpB Returns

11

JD254
Parking Permit EXPIRES!!

12

JD255
Site Visit (SpB, SS): Details , Photos (27)

at ~12:00 MST, moved two TCs to the temperature IC area

at ~12:30 MST, moved orst prt temperature sensor to be slightly above the 2m T/RH sensor

connected the laser (tga) to the network/internet.

13

JD256
First snowfall of the year (dusting).

14

JD257
Site Visit (MW): Details

soils sampled. (MW)

15

JD258
Site Visit (SpB): Details , Photos (13)

at ~12:30 MST, moved orst prt temperature sensor up to the 8m T/RH sensor

at ~15:00 MST, added back one of the AM25Ts to the TC logger (start using tc_02.csi)

return JEEP.

16

JD259
Site Visit (AT): Details

ozone target replaced.

17

JD260

18

JD261

19

JD262
CO2 Experts Meeting (CU/UMC)

20

JD263
Site Visit (SpB, LSD): Details , Photos (16)

at ~9:40 MST, swiped krypton hygrometer

at ~9:50 MST, switched span gas at the tower (from airgas CA02337 to S-M CC114714)

at ~10:40 MST, added 257l soil wetness sensor to ucb logger (ucb_02.csi)

at ~12:20 MST, connected all wires to the repaired AM25T (at the TC logger)

21

JD264
CO2 Experts Meeting (CU/UMC)

22

JD265
Fall Equinox
Site Visit (SpB, JH, LSD, TR, RM, MW, NT, CK): Details , Photos (26)

Tree Core/Needle/Bark Collections by Jia, et al.

at ~11:00 MST, power problems at SOIL Logger, disconnected UCB and moved battery to soil logger.

Suburban Rental

23

JD266
added refurbished EXB-8505XLE tape drive to urquell

24

JD267
Site Visit (KR): Details

east/west robot flasks swapped (KR)

25

JD268

26

JD269

27

JD270
Site Visit (SpB, MW): Details , Photos (23)

Soils sampled (MW)

at 10:00 MST, laser dewar topped off (from 17cm to 29cm) (SpB)

from 10:16-10:50 MST, Changed profiler (li-6251) dessicant

at ~11:00 MST, moved new battery out for SOIL logger

at ~12:00 MST, reconnected UCB logger.

28

JD271

29

JD272
Site Visit (SpB, JH, NM, P, DA, RL): Details , Photos (18)

at 10:35 MST, ozone target replaced.

from 11:15-11:20 MST, swapped out the N2 cylinder

from ~13:00-13:30 MST, buried soil matrix probe, new wire for 2m Rnet.

Compact Rental

30

JD273

1

JD274
Site Visit (KR): Details

laser dewar topped off (new level?)

east/west robots, done=2, air flasks swapped (KR)