Previous | Calendar |
June |
2005 |
Next | ||
---|---|---|---|---|---|---|
Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday |
29JD149Site Visit (SpB): Details , Photos (11) at 10:30 MST, data system back up Hydra data stop being saved. |
30JD150Memorial Day |
31JD151 |
1JD152Site Visit (SpB, LSD, MW, L, KR, PC): Details , Photos (8) Summer Jeep Rental (starts) at 10:45 MST, chan200+hydra back on data system (start ops23) Hydra data are saved again (though not switching properly?) from 11:30-11:44 MST, Changed profiler (li-6251) dessicant Soil Sampled (MW/LSD/L/PC) |
2JD153Site Visit (JH, LSD): Details "Pre-dawn" Transpiration Measurements. |
3JD154 (hailstorm)Site Visit (SpB, KR): Details , Photos (32) from 9:30-10:30 MST, using N2 as a ref gas for ec/prof systems Hydra not working, bad relay? east/west robots, done=1, flasks swapped (KR) |
4JD155 |
5JD156 |
6JD157 |
7JD158 (fair-w Cu)Site Visit (SpB, KR, PC, A): Details , Photos (40) at 11:05 MST, adjusted flow rate to li-6251 removed hydra data from data system (starts ops24) at 10:15 MST, Hydra data removed from data system east/west robots, done=0 (KR/PC) |
8JD159SpB Off |
9JD160Site Visit (KR, PC): Details east robot done=1, west robot done=2, flasks swapped (KR/PC) SpB Off |
10JD161SpB Off |
11JD162 |
12JD163 |
13JD164SpB Off |
14JD165Flag Day |
15JD166 |
16JD167 (Afternoon T-storm)at 14:30 MST, data system crashes. |
17JD168 (Hot/Upslope)Site Visit (SpB, KR): Details , Photos (34) "Pre-dawn" Transpiration Measurements (JH/A). at 7:25 MST, data system back up. from 9:40-11:26 MST, Changed profiler (li-6251) dessicant and inlet filters at ~9:00 MST, swiped krypton hygrometer east/west robots, done=1, flasks swapped (KR) |
18JD169 |
19JD170Fathers Day |
20JD171 |
21JD172Summer Solstice Site Visit (SpB, KR, PC): Details , Photos (26) |
22JD173 |
23JD174Site Visit (SpB, KR, PC, A): Details , Photos (10) Site Visit by B.Vaughn and D.Richter at 10:11 MST, increased flow rate to li-6251 east/west robots, done=1, flasks swapped (KR/PC) |
24JD175"Pre-dawn" Transpiration Measurements (JH/A). Removed extra ozone instrument and sonic(s) (AT) |
25JD176 |
26JD177 |
27JD178 |
28JD179Site Visit (SpB, KR, PC, A): Details , Photos (29) at ~10:30 MST, removed hydra transformer & power cable (returned to NCAR) at ~11:30 MST, increased flow rate to li-6251 |
29JD180 |
30JD181Site Visit (SpB, KR, PC): Details , Photos (28) at 10:00 MST, replaced span gas at tower (CC187532 replaced with S-M cylinder CA02337) from 11:30-12:44 MST, Changed profiler (li-6251) dessicant and tried to adjust the p.prof for the N2/Span tanks at 13:00 MST, added 107-L temperature probe to the soil logger, soilsno2.csi (SpB/KR) east robot (done=2), west robot (done=1), flasks swapped (KR) |
1JD182 |
2JD183 |