Previous | Calendar |
November |
2005 |
Next | ||
---|---|---|---|---|---|---|
Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday |
30JD303 |
31JD304(windy)Halloween (boo!) |
1JD305 (blustery)Site Visit (SpB): Details , Photos (25) at 11:00 mst, rebooted russter2 at ~15:30 MST, swapped span gas (old cylinder=CC114714 (S-M) , new cylinder= CC156367) at 14:35 MST, Laser dewar topped off (to 35.5 cm) at 15:00 MST, setup 3 TCs connected to tc23x to branch Compact Rental |
2JD306Site Visit (AT): Details ozone flux instrument shutdown (and taken off the tower) slow ozone instrument (o3.slow) turned off at 12:00 MST, hi-rate data archiving stopped on russter2 (restarted at 15:55 MST) |
3JD307Lab Meeting at 12:15 (TR) |
4JD308CME Meeting at FLAB (8:30-10:30) |
5JD309Site Visit (KR): Details laser dewar topped off east/west robot: 4-flask swapped (KR) |
6JD310 |
7JD311 |
8JD312(windy)Site Visit (SpB, LSD, MW): Details , Photos (16) soils sampled. (MW) from 11:27-11:44 MST, Changed profiler (li-6251) dessicant Jeep Rental |
9JD313 |
10JD314Lab Meeting at 12:15 (LL) |
11JD315 |
12JD316 (snow)Site Visit (SS, KR): Details Sean Schaeffer replenishes laser cylinders. |
13JD317 (snow) |
14JD318 (snow) |
15JD319 |
16JD320 |
17JD321Lab Meeting at 12:15 (NT) |
18JD322 |
19JD323 |
20JD324 (calm/clear)Site Visit (SpB, KR, JM, J): Details , Photos (32) at 13:00 MST, swiped kryton hygrometer NOTE: alignment of 21.5m csat had changed slightly (due to high winds) pfp installed in the shed (JM) laser dewar topped off, 12cm to 25.5cm (SpB) east/west robots: flasks swapped (KR) Compact Rental |
21JD325 |
22JD326SpB Off |
23JD327 |
24JD328CU Holiday (TURKEY DAY) |
25JD329Site Visit (KR): Details laser dewar topped off east/west robot: not finished, no swap (KR) CU Holiday (day after TURKEY DAY) SpB Returns |
26JD330 |
27JD331 |
28JD332 |
29JD333 |
30JD334(snow) |
1JD335(snow)Lab Meeting at 12:15 (SpB) |
2JD336(snow) |
3JD337(snow) |