Previous | Calendar |
January |
2005 |
Next | ||
---|---|---|---|---|---|---|
Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday |
26JD361 |
27JD362 |
28JD363 |
29JD364at 10:30 MST, decreased hydra cals from every 3 hours to every 6.5 hrs (hydra_prog_*_ver4.txt). |
30JD365 |
31JD366 |
1JD1 |
2JD2 |
3JD3 |
4JD4SpB Vacation (ends) |
5JD5(Cold/Windy) |
6JD6Site Visit (SpB, JH): Details , Photos (32) at 12:45 MST: Replaced tower N2 at ~16:00 MST, restarted hydra, pump now on cal2 relay. Jeep Rental |
7JD7 |
8JD8 |
9JD9 |
10JD10 |
11JD11Site Visit (MW): Details Mike W. collected soil samples (at hydra inlets). at ~15:00 MST, shutdown hydra (cal2 gas was being used). |
12JD12 |
13JD13Site Visit (SpB, MW, ML, M/D/A/E): Details , Photos (35) 12:30-13:15 MST, rebooted/upgraded russter2 Snow Pit (MW) at ~13:00 MST, restarted hydra (turned off cal2). Jeep Rental |
14JD14 |
15JD15 |
16JD16 |
17JD17 |
18JD18 |
19JD19 |
20JD20(Calm/Warm)Site Visit (SpB): Details , Photos (48) Replaced tower span gas from 13:31-13:45 MST, Changed profiler (li-6251) dessicant Zeroed li-6262 Re-installed the repaired 2.5m LI-COR LI-7500 Removed GMP-343 from the UC tower (TWOSONIC.CSI) Jeep Rental |
21JD21 |
22JD22 |
23JD23 |
24JD24 |
25JD25Site Visit (SpB, AT): Details , Photos (31) fast ozone system running gain (AT) |
26JD26 |
27JD27Snow Pit (MM/DG) |
28JD28Jeep Rental (cancelled on 1/26) |
29JD29 |
30JD30 |
31JD31SpB Off |
1JD32SpB Off |
2JD33Site Visit (MW): Details Mike W. collected soil samples. |
3JD34Site Visit (SpB): Details , Photos (53) Jeep Rental 11:00 MST, rebooted russter2 KZ PSP connected again at Hydra: C1=750ppm, C2=PUMP, C3=1000ppm, C4=400ppm. Snow Pit (SpB) |
4JD35 |
5JD36 |