Previous | Calendar |
March |
2004 |
Next | ||
---|---|---|---|---|---|---|
Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday |
1JD61Site Visit (SpB, AS, EA, +): Details , Photos (7) Hydra: Increased Profiler sampling rate...injected co2 under snowpack (w/ propane tank of co2/air). |
2JD62 |
3JD63Robots Start Attempting to Fill Flasks |
4JD64 |
5JD65 |
6JD66 |
|
7JD67 |
8JD68Site Visit (AT): Details quacker down at 10:50am; back up around 12:00 Check Robot Flasks |
9JD69Site Visit (SpB, BB, AS, EA): Details , Photos (49) Robot Flasks Swapped (BB) Snow Pit (BB) Hydra: Increased Profiler sampling rate...injected co2 under snowpack (w/ tank of pure co2). NCAR ACD took some undersnow samples at the Hydra site |
10JD70 |
11JD71 |
12JD72 |
13JD73 |
14JD74 |
15JD75 |
16JD76 |
17JD77 (Windy)St Patricks Day Site Visit (SpB): Details , Photos (48) from 16:00-16:30 MST, Changed profiler (li-6251) dessicant Snow Pit (SpB) Hydra: Increased Profiler sampling rate...injected co2 under snowpack at 2 different locations (w/ tank of pure co2). |
18JD78 |
19JD79 |
20JD80First Day of Spring TC Datalogger starts having power problems (~22:50 MST) |
21JD81 |
22JD82Hydra: Ran hydra with continual drawing of air through undersnow inlets (~18:00-~9am morning of 3/23). Soil Datalogger starts having power problems (~18:25 MST) |
23JD83 |
24JD84 |
25JD85 |
26JD86Site Visit (SpB, TR, RM, AW): Details , Photos (66) Snow Pit (SpB) Hydra: Increased Profiler sampling rate...injected co2 under snowpack at 1 location (w/ tank of pure co2). |
27JD87 |
28JD88 |
29JD89 |
30JD90 |
31JD91Robots Start Attempting to Fill Flasks |
1JD92Site Visit (SpB): Details , Photos (59) West Robot has done=1, East Robot has done=0 Snow Pit (SpB) Hydra: Did co2 injections at 3 different locations with constant sucking (used tank of pure co2). |
2JD93 |
3JD94 |