Previous

Calendar

October

2004

Next
Sunday Monday Tuesday Wednesday Thursday Friday Saturday

26

JD270
Site Visit (SpB): Details , Photos (7)

27

JD271

28

JD272

29

JD273

30

JD274
Site Visit (SpB, JH): Details , Photos (45)

Stopped common inlet from CU to Hydra; blow test confirmed this did NOT WORK! (SpB).

East/West Robot flasks swapped (SpB/JH).

1

JD275
Official End Date of CME.

2

JD276

3

JD277
Site Visit (SpB): Details , Photos (31)

Set up PAR/photodiode sensors

4

JD278
Site Visit (SpB, RD, SO, DS, KK, C, SS): Details , Photos (9)

Roger Dahlman site visit

5

JD279
Site Visit (SpB, MW, KK, SS, C, JM): Details , Photos (29)

Ameriflux Meeting

Moved Hydra to near CU tower

Added photodiode data to data system

6

JD280(Rain/Snow)
Ameriflux Meeting

Tower Data Acquisition Code Updated (ndaq)

7

JD281
Site Visit (SpB, MW, DA, HL): Details , Photos (12)

Ameriflux Meeting

Closed stopcocks at East/West Robots (SpB).

Profiler KNF pump is having problems

8

JD282
Site Visit (SpB, KK, AT): Details , Photos (3)

Andrew setup pressure sensors in fast Ozone system

9

JD283
Site Visit (SpB): Details , Photos (5)

Added pressure sensor data to data system

Swapped flasks at East/West Robots, switched logger program to a monthly cycle (SpB).

10

JD284
Site Visit (SpB): Details , Photos (1)

Replaced KNF pump at profiler

Added hydra to data system

11

JD285
Site Visit (SpB, CXY, KK, SS, SO, JM, C): Details

Aspen Tower comes down.

12

JD286
Site Visit (SpB, JH, J, KK, SO): Details , Photos (1)

Pine Tower comes down.

Moved snow temperature probes to new hydra location

13

JD287(Snow)
Power Outage (for a few hours in the morning)

14

JD288
Site Visit (SpB): Details , Photos (4)

Made thermocouples at MRS (started installing)

15

JD289
Site Visit (SpB, CXY, JH, JM, DB): Details , Photos (11)

Moved Shed from Trailer to Tower

16

JD290
Site Visit (SpB, DB, JM, K): Details , Photos (38)

Hydra inlets connected

17

JD291
Site Visit (SpB, DB): Details , Photos (5)

(Dave Bowling completes the shed!)

18

JD292
Site Visit (SpB): Details , Photos (6)

19

JD293
Site Visit (SpB, AS+, EA, BL): Details , Photos (15)

Worked on thermocouples

20

JD294
Site Visit (SpB): Details

Serial line from hydra site to tower

21

JD295(Sunny/Warm)
Site Visit (SpB, MW): Details , Photos (2)

Blew out hydra lines; buried soil thermocouples

East Robot had done=1

22

JD296

23

JD297
Site Visit (SpB): Details , Photos (13)

24

JD298
Site Visit (SpB): Details , Photos (30)

25

JD299

26

JD300
Site Visit (SpB): Details , Photos (7)

27

JD301
Site Visit (SpB, MW): Details , Photos (13)

Started collecting data from Hydra.

28

JD302

29

JD303(Windy/Cold)

30

JD304
Site Visit (SpB): Details , Photos (16)

Switched inlet lines B2 and B3.

Changed profiler dessicant

31

JD305(Snow)
Daylight savings time ends.

1

JD306(Snow/Cold )
~23:00 MST, data system crashed.

2

JD307
Site Visit (SpB): Details , Photos (7)

(hydra down)

~15:00 MST, restarted data system
(ops19, w/ only one edgeport, nwt041102.220251)

3

JD308
Site Visit (SpB, ML, MW): Details , Photos (5)

at 14:00 MST, hydra back up

at 14:00 MST, back to ops18, two edgeports, nwt041103.205212

4

JD309

5

JD310
Site Visit (SpB, JH, JM): Details

at ~12:00 MST, LI-COR LI-7500 at 2.5m was removed to send back to LI-COR for solar radiation fix/repair

East/West Robot flasks swapped (JM)

at 10:00 MST, dry ice test w/ hydra

6

JD311