26JD270Site Visit (SpB): Details , Photos (7) |
27JD271 |
28JD272 |
29JD273 |
30JD274Site Visit (SpB, JH): Details , Photos (45) Stopped common inlet from CU to Hydra; blow test confirmed this did NOT WORK! (SpB). East/West Robot flasks swapped (SpB/JH). |
1JD275Official End Date of CME. |
2JD276 |
3JD277Site Visit (SpB): Details , Photos (31) Set up PAR/photodiode sensors |
4JD278Site Visit (SpB, RD, SO, DS, KK, C, SS): Details , Photos (9) Roger Dahlman site visit |
5JD279Site Visit (SpB, MW, KK, SS, C, JM): Details , Photos (29) Ameriflux Meeting Moved Hydra to near CU tower Added photodiode data to data system |
6JD280(Rain/Snow)Ameriflux Meeting Tower Data Acquisition Code Updated (ndaq) |
7JD281Site Visit (SpB, MW, DA, HL): Details , Photos (12) Ameriflux Meeting Closed stopcocks at East/West Robots (SpB). Profiler KNF pump is having problems |
8JD282Site Visit (SpB, KK, AT): Details , Photos (3) Andrew setup pressure sensors in fast Ozone system |
9JD283Site Visit (SpB): Details , Photos (5) Added pressure sensor data to data system Swapped flasks at East/West Robots, switched logger program to a monthly cycle (SpB). |
10JD284Site Visit (SpB): Details , Photos (1) Replaced KNF pump at profiler Added hydra to data system |
11JD285Site Visit (SpB, CXY, KK, SS, SO, JM, C): Details Aspen Tower comes down. |
12JD286Site Visit (SpB, JH, J, KK, SO): Details , Photos (1) Pine Tower comes down. Moved snow temperature probes to new hydra location |
13JD287(Snow)Power Outage (for a few hours in the morning) |
14JD288Site Visit (SpB): Details , Photos (4) Made thermocouples at MRS (started installing) |
15JD289Site Visit (SpB, CXY, JH, JM, DB): Details , Photos (11) Moved Shed from Trailer to Tower |
16JD290Site Visit (SpB, DB, JM, K): Details , Photos (38) Hydra inlets connected |
17JD291Site Visit (SpB, DB): Details , Photos (5) (Dave Bowling completes the shed!) |
18JD292Site Visit (SpB): Details , Photos (6) |
19JD293Site Visit (SpB, AS+, EA, BL): Details , Photos (15) Worked on thermocouples |
20JD294Site Visit (SpB): Details Serial line from hydra site to tower |
21JD295(Sunny/Warm)Site Visit (SpB, MW): Details , Photos (2) Blew out hydra lines; buried soil thermocouples East Robot had done=1 |
22JD296 |
23JD297Site Visit (SpB): Details , Photos (13) |
24JD298Site Visit (SpB): Details , Photos (30) |
25JD299 |
26JD300Site Visit (SpB): Details , Photos (7) |
27JD301Site Visit (SpB, MW): Details , Photos (13) Started collecting data from Hydra. |
28JD302 |
29JD303(Windy/Cold) |
30JD304Site Visit (SpB): Details , Photos (16) Switched inlet lines B2 and B3. Changed profiler dessicant |
31JD305(Snow)Daylight savings time ends. |
1JD306(Snow/Cold )~23:00 MST, data system crashed. |
2JD307Site Visit (SpB): Details , Photos (7) (hydra down) ~15:00 MST, restarted data system (ops19, w/ only one edgeport, nwt041102.220251) |
3JD308Site Visit (SpB, ML, MW): Details , Photos (5) at 14:00 MST, hydra back up at 14:00 MST, back to ops18, two edgeports, nwt041103.205212 |
4JD309 |
5JD310Site Visit (SpB, JH, JM): Details at ~12:00 MST, LI-COR LI-7500 at 2.5m was removed to send back to LI-COR for solar radiation fix/repair East/West Robot flasks swapped (JM) at 10:00 MST, dry ice test w/ hydra |
6JD311 |