Previous

Calendar

August

2003

Next
Sunday Monday Tuesday Wednesday Thursday Friday Saturday

1

JD213

2

JD214

3

JD215
Site Visit (AT): Details

East Robot Valves Closed and Flasks Swapped; West Robot Power Failure (AT)

New TC logger program: soil23xC.csi (includes IRTemp)

4

JD216

5

JD217

6

JD218
Site Visit (AT): Details

Updated Program downloaded to Robot Loggers (AT)

Moved ATI and Li7500 from 21.5m down to 12.3m

7

JD219

8

JD220

9

JD221
Network to Russter down

10

JD222

11

JD223

12

JD224

13

JD225
Site Visit (AT,LSD,BB): Details

Robot Valves Closed and Flasks Swapped (AT)

SpB Back

14

JD226

15

JD227
Site Visit (AT,SpB,RM): Details

~11AM, TGA Dewar Filled (SpB)

TGA Inlet Filters Changed; Pump Oil Changed

16

JD228

17

JD229

18

JD230
Site Visit (SpB): Details , Photos (15)

~13:00, TGA Dewar Filled (SpB)

East Robot Stopcocks Closed; West Still Open (SpB)

19

JD231

20

JD232
Site Visit (AT,SpB,RM): Details

~12:00, TGA Dewar Filled (SpB)

Swapped East and West Robot Flasks (SpB)

21

JD233

22

JD234
TGA Dewar Filled (BB)

23

JD235

24

JD236

25

JD237
Site Visit (SpB): Details , Photos (33)

~11:00, TGA Dewar Filled (SpB)

East & West Robot Stopcocks Closed (SpB)

New 160-l LN2 Dewar Delivered to MRS.

26

JD238

27

JD239
Site Visit (AT,LSD,JH)

28

JD240

29

JD241
Site Visit (SpB): Details

~16:00, TGA Dewar Filled (SpB)

East Robot Dessicant trap changed (SpB)

30

JD242
POWER OUTAGE (~4am)...quacker shutdown.