Previous | Calendar |
August |
2000 |
Next | ||
---|---|---|---|---|---|---|
Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday |
30JD212 |
31JD213 |
1JD214 |
2JD215 |
3JD216 |
4JD217 |
5JD218 |
6JD219 |
7JD220 |
8JD221 |
9JD222 |
10JD223 |
11JD224Site Visit (AT): Details Info about LI-7500 DAC setup at 13:35, REBs radiometers OFF downloaded SOIL logger |
12JD225 |
13JD226 |
14JD227Site Visit (AT): Details at 11:00, REBS #1 Rnet radiometer ON at 26m at 12:00, REBS #2 Rnet radiometer ON at 16m at 12:00, removed NR.LITE radiometer from 14:00-15:00, LI-7500 and krypton OFF (recalibrated LI-7500) |
15JD228 |
16JD229 |
17JD230 |
18JD231 |
19JD232 |
20JD233 |
21JD234 |
22JD235Site Visit (AT): Details from 12:00-12:30, replaced EC inlet line and filters from 13:30-13:45, changed profiler (li-6251) dessicant grounded MET data logger |
23JD236 |
24JD237Site Visit (AT): Details swapped N2/zero cal cylinder at 10:30, swapped span gas cylinder |
25JD238Site Visit (AT): Details from 12:10-12:20, replaced EC/LI-6262 copper heat exchanger from 12:30-13:15, moved ATI sonic to 5.75 m on subcanopy tower from 13:15-13:45, moved 8-m T/RH to point to other site of tower CR23X SOIL logger (see AT logbook notes)? |
26JD239 |
27JD240 |
28JD241 |
29JD242Site Visit (AT): Details Issues with pressure in EC/LI-6262 system (turned out to be filter in box, replaced on 9/1) |
30JD243 |
31JD244 |
1JD245 |
2JD246 |