1JD61Site Visit (AT): Details network down in AM; ok in PM 12-12:45 replaced CO2 inlet filter (new inlet arrangement-no stainless steel) removed filter from SECLOD |
2JD62Site Visit (AT): Details flow/signal tests with SECLOD |
3JD63 |
4JD64 |
5JD65 |
6JD66 |
7JD67 |
8JD68 |
9JD69 |
10JD70Site Visit (AT): Details more flow/signal tests with SECLOD |
11JD71 |
12JD72 |
13JD73Site Visit (AT): Details from 11:00-11:30, removed RMYoung #2 @ 10m at 12:00, downloaded PROF30 logger data |
14JD74 |
15JD75 |
16JD76Site Visit (AT): Details from 15:00-15:30, moved ATI sonic down 1 level (was at 21.5m) from 15:33-15:45, cleaned kr hyg. optics |
17JD77 |
18JD78 |
19JD79 |
20JD80Spring Equinox |
21JD81 |
22JD82 |
23JD83 |
24JD84Site Visit (AT): Details at 11:00, new co2/span cylinder at 13:30, downloaded CNR logger data replumbed SECLOD system |