Previous | Calendar |
October |
2000 |
Next | ||
---|---|---|---|---|---|---|
Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday |
1JD275 |
2JD276Site Visit (AT): Details downloaded SOIL logger data |
3JD277 |
4JD278Site Visit (AT): Details swapped N2/zero cal cylinder put brace on tower leg |
5JD279 |
6JD280 |
7JD281 |
8JD282 |
9JD283Site Visit (AT): Details at 15:30, put LI-7500 back on the tower (w/ both SDM and analog output) FAST CR23X output: u, v, w, tc, diag, o3.stat, co2.ec, t.ec, p.ec, h2o.ec, h2o.kr, ec.flow, h2o.dig, co2.dig, co2.mmol, h2o.mmol from 15:30-17:00, replaced IRGA LI-6251 sn 308 (making strange sounds) with freshly calibrated LI-6262 (sn 638) dropped IRGA LI-6251 (sn 308) off the tower! Columbus Day |
10JD284 |
11JD285 |
12JD286 |
13JD287 |
14JD288 |
15JD289 |
16JD290Site Visit (AT): Details from 11:00-11:20, new MET logger code; moved prop-vane WS to different channels at 11:20, reset LI-7500 (still spiking issue) at 11:30, new tilt on CNR radiometer (see AT logbook for details) from 13:15-13:30, replumbed ref N2 to go through the LI-6251, then through the LI-6262 from 14:30-15:30, pressure cal of EC system |
17JD291 |
18JD292Site Visit (AT): Details from 10:55-10:58, manual zero/span of EC/LI-6262 system |
19JD293 |
20JD294 |
21JD295 |
22JD296 |
23JD297 |
24JD298 |
25JD299 |
26JD300 |
27JD301 |
28JD302 |
29JD303 |
30JD304 |
31JD305Halloween |
1JD306 |
2JD307 |
3JD308 |
4JD309 |