Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday |
1JD213Site Visit (AT): Details at 6:30 MST, data system back up rain guage precip data start being more than daily avg (ie, valid 30-min data start HERE). added NR.LITE net radiometer (pointed toward SE on 2nd level from top of tower) |
2JD214 |
3JD215Site Visit (AT): Details replaced N2 cylinder Changed profiler (li-6251) dessicant swiped krypton hygrometer on 8/2, RH at 2m was not working correctly (removed sensor, dried it out and resealed it). Seemed ok after repairs. |
4JD216 |
5JD217 |
6JD218 |
7JD219 |
8JD220 |
9JD221 |
10JD222Site Visit (AT): Details N2 cylinder was empty (must of had a leak) at 16:00, new span tank? from 10:00-11:00, re-installed the repaired LI-6262 (sn #638) in the EC system Autocalibrations have not been working (since either 8/3 or 8/6) at 12:00, autocals running again needed to power-cycle LI-6251 (in prof system) |
11JD223 |
12JD224Site Visit (AT): Details Profiler has been off for ~24 hrs at 10:00, put IRGA #368 back into profiler system and running again Autocalibrations still having problem (delivery pressure on regulator too low?) |
13JD225 |
14JD226 |
15JD227 |
16JD228 |
17JD229 |
18JD230 |
19JD231Site Visit (AT): Details from 10:22-11:14, manual calibration of LI-6251/prof system at 11:33, changed filter in EC system (also switched out teflon tubing in LI-6262 box for dekabon tubing; no change in flow rate) at 12:00, change prep.config and cover.config to include O3 fast sensors at 14:30, took down REBS #2 (#1 still up) in PM, top circuit breaker popped |
20JD232 |
21JD233 |
22JD234Site Visit (AT): Details from 11:15-16:00, working on fast O3 system at 16:00, changed nupro inlet filter for EC system |
23JD235 |
24JD236 |
25JD237Site Visit (AT): Details Re-did plumbing on SECLOD O3 system Only using fast1.o3 (disconnected pump to other) In CNR/Blanken CR23X (start using CNR2.CSI) |
26JD238 |
27JD239 |
28JD240 |
29JD241 |
30JD242Site Visit (AT): Details at top of tower, replaced the BLANKEN CR23X with the BOWLING CR23X (still called CNR/RAD CR23X logger) re-leveled radiation sensors: CNR-1, Q7.1 (this was okay), PAR sensors, NR.Lite (also moved, pointed toward south 1 level below CNR-1 and Q7.1) |
31JD243Site Visit (LSD): Details Laura moved the 1m co2 inlet to 11cm (0.11m), also moved it out into the woods |
1JD244 |
2JD245 |
3JD246 |
4JD247 |