Previous | Calendar |
June |
1999 |
Next | ||
---|---|---|---|---|---|---|
Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday |
30JD150 |
31JD151Memorial Day |
1JD152 |
2JD153 |
3JD154 |
4JD155 |
5JD156 |
6JD157 |
7JD158Site Visit (AT): Details new N2 and span gas? |
8JD159Site Visit (AT): Details Hooked up nafion dryer to prof system Grounded CSI boxes to the tower |
9JD160Site Visit (AT): Details at around 12:00, swapped out the prof IRGA (LI-6251, #368) for a borrowed LI-6262 from NCAR (LI-6262, #700). for LI-6262, p.prof is now really h2o.prof |
10JD161 |
11JD162Site Visit (AT): Details before 11:00, moving some things in prof system plugged prof pump into outlet at bottom of tower moved sonic from 18.5m to 14.5m (not sure which sonic?) |
12JD163 |
13JD164 |
14JD165Flag Day |
15JD166Site Visit (AT): Details changed profiler desiccant measured guy wires tension |
16JD167new LIGHT.csi wiring diagram (see AT logbook) |
17JD168 |
18JD169 |
19JD170 |
20JD171EC system crashes Fathers Day |
21JD172Site Visit (AT): Details moved Rnet sensor to other side of tower (above CSAT3) rewired LIGHT CR12X (new program LIGHT2.csi, see diagram in AT logbook) status.ec is now output directly (not measured in DIFF CR21X channel) unplugged autocalibrations on EC system Change in OPS file (change to chanXX w/ Rad,RH,status.ec) Summer Solstice |
22JD173Site Visit (AT): Details updated PROF CR23X, status.prof is now output directly (not measured by DIFF channel) |
23JD174Site Visit (AT): Details at 15:00, moved ATI sonic to 16m moved 18m T/RH sensor to 21.5m (next to CSAT3 sonic) |
24JD175Site Visit (AT): Details re-started EC system autocalibrations re-plumbed PROF system at approx 15:45, PAR sensors up and running |
25JD176 |
26JD177 |
27JD178 |
28JD179diagram for leaf wetness sensor wiring (see AT logbook) |
29JD180Site Visit (AT): Details replaced N2 gas cylinder at around 12:00, swapped out the borrowed NCAR IRGA (LI-6262, #700) for the old prof IRGA (LI-6251, sn 368). hooked up O3 (TECO) dug up heat flux plates and re-buried near canopy access towers (see AT logbook for details) |
30JD181Site Visit (AT): Details at 12:00, new co2 span gas added AM416 (heat flux plates) to SOIL 21X (see diagram in AT logbook) added leaf wetness sensor to PROF logger (new program prof23x2.csi) start of a new OPS file |
1JD182 |
2JD183 |
3JD184 |