Previous | Calendar |
July |
2018 |
Next | |||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday | |||||||
1JD182Site Visit (SpB): Details , Photos (7) Span cylinder at 1220 psi. N2 at 1750 psi at around 12 MST, replaced the GAST pump for the LI-6262/EC system at 12:20 MST, changed the DAC output range for LI-7200 co2 from 360-->410 to 360-->460 SpB Pruis Clear skies; a bit breezy |
2JD183 |
3JD184 |
4JD185Independence Day |
5JD186 |
6JD187 |
7JD188 |
|||||||
8JD189 |
9JD190SpB Off |
10JD191 |
11JD192 |
12JD193 |
13JD194 |
14JD195 |
|||||||
15JD196 |
16JD197 |
17JD198 |
18JD199 |
19JD200Site Visit (SpB): Details , Photos (20) Span cylinder at 1100 psi. N2 at 1400 psi at 13:15 MST, replaced tc4 in NCTC logger with a new thermocouple (old one was broken; all 12 appear to be working!) at ~15:30 MST, moved par.kz1_old to downward-looking, and couple with par.kz2_new (upward-looking), placed on boom off the platform SpB Jeep Clear skies; quite warm and dry |
20JD201 |
21JD202 |
|||||||
22JD203 |
23JD204note: RH5.met does not appear to be working (no aspiration?) in PM: clouds and fog rolled in |
24JD205 |
25JD206 |
26JD207 |
27JD208 |
28JD209
|
29JD210
|
30JD211
|
31JD212
|
1JD213
|
2JD214Site Visit (SpB): Details , Photos (24) Span cylinder at 970 psi. N2 at 1170 psi from 12:00-12:40 MST, moved a connection box for the REBS Q-7.1 sensor closer to the CNR enclosure/box from 12:40-13:00 MST, replaced domes on REBS Q-7.1 Rnet sensor from 14:30-15:00 MST, swapped the inlet assembly for the LI-7200 (flow was at zero) the connection to the FLIR camera has been suspect--tried to figure out the issue (bring monitor cable!!) SpB Jeep High clouds; calm; warm
|
3JD215
|
4JD216 |