Previous

Calendar

January

2017

Next
Sunday Monday Tuesday Wednesday Thursday Friday Saturday

1

JD1
Site Visit (SpB): Details , Photos (6+)

Span cylinder at 410 psi. N2 at 1550 psi

26-m prop vane noisy, needs fixing/replacing

Dome on the 2m REBS Q*7.1 Rnet sensor is cracked (see photo)

SpB Jeep

Blustery, calmed down in PM

2

JD2
CU Holiday

3

JD3

4

JD4

5

JD5
Big snow (and very cold)

6

JD6

7

JD7

8

JD8

9

JD9
Warm and windy

10

JD10
From cockpit: Ttc.2 (subcanopy tower) and Ttc.csat4 are both having issues. T3 (nctc) is still RIP.

11

JD11
From cockpit: in addition to above, T11 (nctc) not working.

12

JD12
(Full "Wolf" Moon)

13

JD13

14

JD14

15

JD15

16

JD16
CU Holiday (MLK, Jr. Day)

17

JD17

18

JD18

19

JD19

20

JD20

21

JD21

22

JD22

23

JD23
Site Visit (SpB): Details , Photos (22)

Span cylinder at 200 psi. N2 at 1200 psi

moved cc488594 (n2) from trailer to tower, moved cc319297 (n2) from tower to trailer

Fixed T3 and T11 (nctc), still need to fix 26-m prop vane + replace dome on the 2m REBS Q*7.1

SpB Jeep

Warm, steady light snow all day

24

JD24

25

JD25

26

JD26

27

JD27

28

JD28
Chinese New Year (Fire Rooster)

29

JD29

30

JD30

31

JD31

1

JD32

2

JD33

3

JD34

4

JD35